Repair of a jetty at the Club Náutico de Oropesa del Mar (nautical club)
The marina of Oropesa del Mar is constructed of hollow core slabs whose lifetime was almost finished. As a result, it is required to replace regularly these plaques by other lightweight concrete plaques with some coatings and a type of concrete more suitable for the marine environment
Repair of damages caused by the storm of December 2008 at the Real Club Náutico (nautical club) de Castellón
The storm that hit the Puerto de Castellón (Port) in December 2008 caused several damages in the Real Club Náutico de Castellón (nautical club). The repair work included the replacement of a jetty section of 12x10 m and the construction of a submerged wall and concrete reinforcement of the E jetty piles.

